|
|
 |

History
At ENVC (Estaleiros Navais de Viana
do Castelo) shipyard in Portugal two 460.000 cbf / 900 TEU Combined
Reefer/Reefer-Container Vessels were built with a newly developed
design. MPC has contributed design and equipment and was in charge
of site supervision. The vessels were delivered for service in
the Mediterranean Sea in November 2003 and March 2004.

| Main Particulars |
| Length overall |
172,0 m
|
| Length betw. pp |
163,0 m
|
| Breadth |
25,6 m
|
| Depth to Main Deck |
16,3 m
|
| Draught, max |
9,5 m
|
| Deadweight |
17.000 t
|
| Serv. Speed |
21,5 kn
|
| Container, total |
982 TEU
|
| Reefer Cont. |
324 FEU
|
| Reefer Capacity |
350.000 cbf / 4.100 sqm
|

| Main Particulars |
| Length overall |
180,5 m
|
| Length betw. pp |
170,5 m
|
| Breadth |
25,6 m
|
| Depth to Main Deck |
19,35 m
|
| Draught, max |
9,5 m
|
| Deadweight |
18.500 t
|
| Serv. Speed |
21,0 kn
|
| Container, total |
1.124 TEU
|
| Reefer Cont. |
384 FEU
|
| Reefer Capacity |
530.000 cbf / 6.100 sqm
|

| Main Particulars |
| Length overall |
185,0 m
|
| Length betw. pp |
175,0 m
|
| Breadth |
25,6 m
|
| Depth to Main Deck |
19,35 m
|
| Draught, max |
9,5 m
|
| Deadweight |
19.000 t
|
| Serv. Speed |
21 kn
|
| Container, total |
1.098 TEU
|
| Reefer Cont. |
300 FEU
|
| Reefer Capacity |
580.000 cbf / 6.700 sqm
|
|
 |